> WWW.UKPMS.COM NOW ARCHIVED
  > Advice Notes
  > Completion of the Core Indicator Pro-Forma for Best Value Road Condition Indicators
  > Condition Ranking
  > Consistency of TTS/SCANNER Results
  > DCD Accreditation Test
  > HMDIF Conversion Software
  > Loading TTS Data - FAQs
  > Misc. Documents
  > OF National Seminar 2004
  > OF National Seminar 2005
  > OF Newsletter
  > Pavement Condition Management Group
  > PCIS Newsletter
  > PCIS Regional Seminars 2009
  > Review of UKPMS Core Functionality
  > Roads Board Advisory Group
  > Roads Board Newsletter
  > SCANNER / TTS Treatment Rules
  > SCANNER Consistency Assessment
  > SCANNER HMDIF Specification
  > SCANNER QA Reports
  > SCANNER Research Reports
  > SCANNER Road Condition Indicator
  > SCANNER Specification 2005/6
  > SCANNER Specification 2006/7
  > SCANNER Specification 2007/8
  > Technical Notes
  > TTS Audit Reports
  > TTS Defects Index Preliminary Analysis
  > TTS Specification
  > UKPMS Annual Health Check 2009
  > UKPMS Health Check 2005
  > UKPMS Health Check 2006
  > UKPMS Health Check 2007
  > UKPMS Health Check 2008
  > UKPMS Rules and Parameters
  > UKPMS-Based BVPI Summary for 2004/05 and 2003/04 Surveys
  > Visual Surveys Best Practice
 
 
 

 

 

 

 

 

Condition Ranking

Defect Length Sorted by Condition Index report

The Ranking Subgroup (a subgroup of the UKPMS Steering Group) met to consider the use of Condition Ranking in UKPMS and the progress report they produced is given below. They have identified the need for a new UKPMS report Defect Length sorted by Condition Index which will be introduced via the Health Check. The specification for this report is published as a Technical Note (TN 32). Advice Note 8 has been published on the use of UKPMS condition ranking.

 




Ranking Subgroup Progress Report Progress Report May 2003 v2.pdf
The progress report produced by the Ranking Subgroup  
   

 

 

 

 

 

 

 

 

 
 
Produced by Chris Britton Consultancy Ltd on behalf of the UKPMS Owners Forum